What is the construction of the plastic track and field venue block paving?


Due to factors such as on-site transportation conditions and difficulty in controlling the construction level, paving can be performed using the block method. The method is on the ground, first according to the width of the runway, each set of two runways to draw a line, according to the line nailed wooden slats, slats size of 12mmx50mmx1500mm, wrapped in plastic film, nailed to the grassroots level, each board No less than two nails. After mixing the mixed solution to the site, pour it between the two wooden slats. Immediately use a squeegee to spread the plastic mixture well and spread out. The length of the wooden squeegee is larger than the spacing between the two slats. The board is walking on a wooden board. See picture.

塑胶田径场

Scraper for wood scraper

1—Wood scraper; 2—Wood strips; 3—Asphalt concrete base; L=Two runway widths

In field competition venues, paving can be carried out using block method according to competition items, such as long-distance runway, high jump zone, pole vault zone, and runway. After each paving, at least 24h, the planks can be lifted out, cleaned and used continuously.



Dumpling Mold

dumpling maker- First making the dumpling wrapper,the wrappers are placed on the dumpling maker.Put the stuffing. Close the dumpling machine. At last,you can open the dumpling machine,the dumpling is finished.You can use the dumpling press mould to make dumpling easier.After finish ,it can be cleaned with water,easy to clean.Also dumpling machine is convenient and efficient.

Dumpling Press,Pelmeni Mold,Dumpling Mould Dough Press,Stainless Steel Ravioli Mold

YANGJIANG SHENGHAI INDUSTRIAL&TRADING CO., LTD , https://www.shenghaiyj.com